The Power of a River

by Jul 29, 2024Community, South Brunswick

In returning the Town of Shallotte’s focus to its namesake river, the Shallotte Riverwalk Project provides a glimpse of the past while reshaping the future.

The Shallotte River, previously known as the Charlotte River, was a busy waterway in the 1800s, carrying barges and their cargo to and from the Atlantic Ocean. Back then, the area was primarily home to farmers and fishermen. The Town of Shallotte was incorporated on March 6, 1899, taking its name from the river.

Today the Shallotte River is not used the way it once was. The land along the river at the south end of Wall Street has a recreational purpose now, used for fishing and tourism, which became popular in the region after World War II.

The waterfront property had fallen into disrepair over the years and had become overgrown with brush and trees. The Town of Shallotte has had a plan to implement major improvements and restore the area to its former luster since 2008.

“Over the years we acquired the individual parcels,” says Shallotte Mayor Walter Eccard. “We took down the machine shop that was on site and cleared much of the overgrowth. We then engaged a builder and had the Riverwalk built. We have 16 acres at the Riverwalk and 9 acres for further development at Mulberry Park.”

Mayor Walter Eccard

After more than a decade of town planning and development, the Shallotte Riverwalk was completed and opened to visitors in September 2021.

“This was a milestone,” Eccard says. “Since we’ve opened it, it has been well received.”

The Shallotte Riverwalk consists of two gazebos, benches along the water and a quarter-mile boardwalk that connects both ends of the park. Ample parking is available. More additions, including two kayak launches, are planned this year.

“When we put in kayak launches it will improve the recreational purpose of the area,” Eccard says. “Construction is taking place off-site, and we hope to have them installed this year.”
Improvements to infrastructure are also included in the planned development near the Riverwalk. New facilities for emergency services are part of the plan, along with dining and shopping experiences that are intended to attract people to the area.

Mulberry Park Expansion Conceptual

“The next thing we are working on is to build a new town hall and police station next to the fire station,” Eccard says. “We also want a quality restaurant and some retail opportunities near the Riverwalk. The plans for construction of town hall should receive approval this year and should be completed within two to three years.”

Significant growth in and around Shallotte has encouraged Shallotte’s mayor and town council to move forward with these improvements.

“We’re adding several new communities to the town and that requires us to provide support services and infrastructure where needed,” Eccard says.

Improvements planned for the Town of Shallotte are not limited to the Riverwalk area on Wall Street. Mulberry Park has already seen a number of expansions and is slated for more upgrades this year as well.

Shallotte NC Riverwalk Park

“We plan to do an extension to the river side of Mulberry Park,” Eccard says. “We will put in another kayak launch, an ability garden, a picnic area, a small child playground as well as an outdoor classroom for teachers. We hope it will be completed by the end of 2024. Further additions to walking trails may take longer.”

While growth is a necessity, the environment and preservation are also playing a vital role in planned development.

Eccard says the town is working to strengthen its tree ordinance to preserve local historic trees in the community, to preserve green space for its citizens to enjoy and to bring the river back to the forefront of town.

Community funding for the Shallotte Riverwalk project and other town improvements have come from a variety of sources. Most notably, the town received a $2 million grant from Brunswick Electric Membership Corporation along with funding from the state level.

Riverwalk Park Shallotte NC

“No tax increases have been needed for the improvements,” Eccard says. “We have built up money in our reserve to cover costs. The state recommends to keep 76% of the operating budget. We try to keep a 90% reserve due to hurricane destruction.”

The vision for a revitalized area along the Shallotte River may have been 16 years in the making, but all the improvements have been and will be worth the wait.
“We’ve come a long way,” says Mayor Eccard. “The citizens of Shallotte seem to be very pleased.”

Want to go?
Shallotte Riverwalk
Access via Cheers Street or Wall Street
Mulberry Park
123 Mulberry Street
Mulberry Park Extension at Price Landing
120 Mulberry Street
(910) 754-4032
townofshallotte.org